TY - JOUR
T1 - Decision support system (DSS) for facilities rehabilitation and management (part 2)
T2 - development of optimized intervention strategy
AU - Aldeeb, Owais
AU - Qasem, Altayeb
N1 - Publisher Copyright:
© 2024, Emerald Publishing Limited.
PY - 2024/7/18
Y1 - 2024/7/18
N2 - Purpose: This paper (Part 2 of 2) aims to expand the previously developed performance assessment model (PAM) into a decision support system (DSS) to produce optimized decisions on rehabilitation of facilities. Design/methodology/approach: The research includes a comprehensive PAM that integrates analytical hierarchy process-multi attribute utility theory methods for the physical, operational, and environmental aspects of the mosque, as described in Part 1 of the study. An optimized intervention tool is added to the PAM to complete the DSS development. The tool determines the optimum maintenance decisions that are in line with the budget and condition criticality. The deterioration measures are created using a deterministic straight-line extrapolation technique, and the intervention actions used in the optimization are specified through literature review and in-depth interviews with 11 experts. The optimization model was simplified into a user-friendly visual basic application and applied to an existing facility case study depicting its useful functionality. Findings: The optimization model recommendation of interventions recovered the overall condition rating index (CRI) of the facility while maintaining budget constraints. The CRI in the first approach (minimum budget to achieve acceptable overall performance) was improved from 6.5 to 7.76, costing 275,850 SAR. While the second approach (Maximum recovery with a selected budget constraint, 300,000 SAR in this case) CRI was improved from 6.5 to 8.3, costing 299,850 SAR. Originality/value: The presented DSS in this paper offers a tool that enables the rehabilitation and overall management of any facility by its managers. The DSS can also be further customized to fit the facility manager’s specific strategies and achieve desired objectives.
AB - Purpose: This paper (Part 2 of 2) aims to expand the previously developed performance assessment model (PAM) into a decision support system (DSS) to produce optimized decisions on rehabilitation of facilities. Design/methodology/approach: The research includes a comprehensive PAM that integrates analytical hierarchy process-multi attribute utility theory methods for the physical, operational, and environmental aspects of the mosque, as described in Part 1 of the study. An optimized intervention tool is added to the PAM to complete the DSS development. The tool determines the optimum maintenance decisions that are in line with the budget and condition criticality. The deterioration measures are created using a deterministic straight-line extrapolation technique, and the intervention actions used in the optimization are specified through literature review and in-depth interviews with 11 experts. The optimization model was simplified into a user-friendly visual basic application and applied to an existing facility case study depicting its useful functionality. Findings: The optimization model recommendation of interventions recovered the overall condition rating index (CRI) of the facility while maintaining budget constraints. The CRI in the first approach (minimum budget to achieve acceptable overall performance) was improved from 6.5 to 7.76, costing 275,850 SAR. While the second approach (Maximum recovery with a selected budget constraint, 300,000 SAR in this case) CRI was improved from 6.5 to 8.3, costing 299,850 SAR. Originality/value: The presented DSS in this paper offers a tool that enables the rehabilitation and overall management of any facility by its managers. The DSS can also be further customized to fit the facility manager’s specific strategies and achieve desired objectives.
KW - Decision support system
KW - Decision-making
KW - Facilities
KW - Maintenance
KW - Mosques
KW - Optimization
KW - Saudi Arabia
UR - https://www.scopus.com/pages/publications/85197455560
U2 - 10.1108/F-11-2022-0145
DO - 10.1108/F-11-2022-0145
M3 - Article
AN - SCOPUS:85197455560
SN - 0263-2772
VL - 42
SP - 729
EP - 747
JO - Facilities
JF - Facilities
IS - 9-10
ER -